Publication Number: ER 37-1-29
Title: Financial Management - Financial Management of Capital Investments
Proponent: CERM
Publication Date: 30 November 2002
Distribution Restriction Statement: Approved for public release; distribution is unlimited.
File Format: Adobe Acrobat.pdf. Adobe Acrobat Reader software is
required to
read pdf files. Click Viewers to access free
Adobe Acrobat Reader
software and follow installation instructions or go directly to the Adobe homepage at http://www.adobe.com.
File Size: Files 1 MB or larger have had their file size noted.
Change 1 - 30 January 2004 Entire document (This file contains all elements of the
document inclusive of appendices. File size: 8.61 MB.) Basic document (This file contains all elements of the document
exclusive of appendices. File size: 2.52 MB.) Table of Contents Chapter 1 - Introduction Chapter 2 - Capital Assets
Chapter 3 - Resourcing Capital Assets Chapter 4 - Plant Replacement and Improvement Program Chapter 5 - Base Commercial Equipment Chapter 6 - Project Equipment Appendix A - Capitalization Thresholds Appendix B - Plant Rental Rate Computation (File size: 1 MB) Appendix C - Transfer and Placement in Service of Assets Acquired by Other than the Asset Owning Command (File size: 2.12 MB) Appendix D - Depreciation, Plant Increment and Insurance Income Appendix E - Preparation of ENG Form 4613-R Appendix F - Preparation of ENG Form 4943-R Appendix G - Acquisition Guidance for Property Asset Funded Through PRIP (File size: 1.16 MB) Appendix H - Preparation of Five-Year Plan Appendix I - PRIP Out-of-Cycle Requirements Appendix J - Delegation of Authorities Appendix K - PRIP Process Flowcharts Appendix L - Lost Design Cost Glossary